Products
Introduced
CFG series long
screw rigs on electrical hydraulie whole sets of
manipulation, while a walk, work to design a
long spiral 2,274 drilling rigs, to drill
through concrete transmission pump pressure fed
into concrete piles (also reinforced
cageinserted after) Produced as a synchronous
Kongcheng pile complete.Installation otation
joints may also be a supuer long screw bored
attitude and various oundation construction
techniques.Widely used for urban
construction,energy,municipal,transportation,water
conservancy the pile,expanding pile, the soft
base with the construction of a free water
restrictions, and efficiency,and energy
conservation,environmental protection,automatic
Guozainengli strong degree of mechanization and
higher
features.
|